Installation guide
Forna Natural Composite floating flooring needs the correct substrate, moisture barrier, expansion, acclimation, and maintenance plan.
Use this page when
- The product is a Swiss specialty floating floor.
- You need installation and maintenance requirements for the exact product family.
- You are preparing an installer, designer, contractor, or commercial project team.
Before you start
- Confirm the product family and locking system before work starts.
- Review subfloor flatness, moisture, underlayment, expansion, and acclimation requirements.
- Discuss the guide with the installer before scheduling the job.
Important
- Do not assume specialty Swiss floors install like ordinary laminate or vinyl.
- Do not hire only on price if the installer does not understand the locking system.
- Do not skip moisture and expansion checks.
Related resources
Browse flooring
Compare flooring families before selecting full cartons.
Choose the right installer
Review installer experience before scheduling specialty flooring work.
Request project help
Ask for help matching the guide to the exact product and room.
Detailed instructions
Forna Natural Composite Flooring
INSTALLATION & MAINTENANCE INSTRUCTIONS
SWISS-QUALITY FLOORING
GENERAL INFORMATION
Forna Natural Composite Flooring features Swiss precision and quality. Thanks to the patented UNICLIC® locking system, installation is quick, easy, and glue-free. Each plank is engineered to lock mechanically, offering a stable, antistatic, slip-resistant, and dirt-repellent surface. This flooring is ideal for renovations—ensure that chipboard or wood subfloors are sanded and vibration-free before installation.
Note: Only Hydrowood core Forna flooring is suitable for wet rooms and may be glued down. HDF-core flooring is not recommended for glued applications. Seal Hydrowood installations in bathrooms with Loba 2K Supra AT.
SUBFLOOR PREPARATION
-
Subfloor must be clean, dry, level, and stable in accordance with DIN 18365.
-
Uneven areas exceeding 3mm per meter must be leveled.
-
Carpeted floors are not acceptable subfloors.
Acceptable Moisture Levels (CM Method):
-
Cement Screed: < 2.0% (or < 1.8% for heated screeds)
-
Calcium Sulfate Screed: < 0.5% (or < 0.3% for heated screeds)
STORAGE & ACCLIMATION
-
Store unopened packages flat for at least 24 hours in the installation room.
-
Maintain room temperature between 59°- 77°F (15–25°C) and 40–60% relative humidity.
PRE-INSTALLATION CHECK
-
Inspect planks in natural light for damage or defects.
-
Minor defects can be used for cuts.
-
Do not install flooring if environmental or product issues are present.
MOISTURE BARRIER (PE FOIL)
-
Use 0.2mm PE foil over mineral subfloors. Overlap seams by 20cm and tape.
-
Extend foil up walls by 2–3 cm.
Tip: Using PE foil promotes smooth floating behavior on any subfloor.
ACOUSTIC UNDERLAY
-
Cork or Green Sound underlayment is pre-attached. No additional underlay is needed.
-
If added, underlay must have a minimum CS value of 200 kPa.
EXPANSION GUIDELINES
-
Max area without expansion joints:100feet x 80feet.ft (30m x 24m).
-
Leave a 10mm expansion gap around walls and fixed objects.
-
Edge joints must not be filled with silicone—use appropriate trims.
INSTALLATION INSTRUCTIONS
-
Open packages as needed and mix planks for pattern variation.
-
Start installation lengthwise toward natural light.
Two UNICLIC® Installation Methods:
1. Angle-to-Angle
-
Tilt at 10°, insert tongue into groove, and lower to lock.
-
Use tapping block (min. 20cm) for tight joints.
2. Angle & Snap
-
Snap short sides together first, then angle and tap long edge.
Offset end joints by minimum 20cm (ideally 40cm).
SPECIAL INSTALLATION NOTES
-
Do not screw, or nail planks.
-
For heavy fixtures (e.g., islands, stoves), install flooring around them or use expansion breaks.
-
Bathroom Use:Glue planks down, Seal all edges with silicone. Use PE round cord for edge joints.
AROUND OBSTACLES
-
Maintain 10mm clearance around pipes and door frames.
-
Use adhesive tape to refit cut pieces.
-
Do not fasten door stops through flooring.
UNDERFLOOR HEATING
-
Max surface temp: 28°C
-
Must be embedded in filler. Click joints must be glued periodically.
Tip: Use a certified heating protocol from the screed supplier.
CLEANING & MAINTENANCE
-
Sweep, vacuum, or damp mop after installation.
-
Use PU cleaner for heavy soiling.
-
Avoid abrasive or solvent-based cleaners.
Initial Care: Apply a light protective coat after installation for added durability.
Protect Your Floor
-
Use dirt-trapping mats at entrances.
-
Use only soft furniture pads or wheels (Type W, EN 12529).
-
Avoid rubber-backed mats or caps.
For more detailed guidance or product-specific recommendations, visit our website or consult your Forna flooring specialist.
